STEF Group project is finished

STEF Group project is finished

We are glad to announce the conclusion of another very important project for our client STEF Group: European leader of the chilled supply chain market. This time the request was for an industrial building of around 10.000 sqm surface. The project we took care included all the structural part (foundation, structure, flooring, canopy, precast), calculation and drawing in BIM.

We also did the ex-built of the architectural part: BIM model with all detail finishing, substructures, insulation.

Partager:

Articles connexes